Skip to main content

Calculation source

נוהל הערכת סיכוני אש למבני תעשייה ואחסון · Version 2, 13.08.2024 · §4.3.2, pages 3, 4, 5

The risk level is determined from two calculations the project already holds — the MAQ result and the fire load — and from four questions about the work process. The tool does not ask for a figure it has already calculated.

Loading the workspace…

Your data is stored in this browser alone and is never sent to Hoshen or to anyone else.

Related professional resources

Documents from Hoshen's library that bear directly on what this tool checks.

Need a professional review?

These tools give a first picture. For a specific review of the building, the materials and the requirements, we would be glad to work with you.