Skip to main content

Calculation source

נוהל הערכת סיכוני אש למבני תעשייה ואחסון · Version 2, 13.08.2024 · §4.3.2, pages 3, 4, 5

The risk level is determined from two calculations the project already holds — the MAQ result and the fire load — and from four questions about the work process. The tool does not ask for a figure it has already calculated.

Loading the workspace…

Your data is stored in this browser alone and is never sent to Hoshen or to anyone else.

Need a professional review?

These tools give a first picture. For a specific review of the building, the materials and the requirements, we would be glad to work with you.